Identified Sites List Information

Project Code:  C406170941 Site Status: Active
Site Name:  UNION PACIFIC RR - OSAWATOMIE RAIL YARD    
CERCLIS Number:     
Other Names:  UPRR FORMER FUELING FACILITY AND SHOP ,SALE PARCEL ,NORTHERN SITE    
Address:  820 SIXTH STREET  City:  OSAWATOMIE
Zip Code:  66064    
County:  MI  River Basin:  Marais des Cygnes
Latitude:  38.49443  Longitude:  -94.95102
Program Name:  Voluntary Cleanup  Project Manager:  JOHNSON, B.
Contaminants:  Refined Petroleum    

Environmental Use Control In Place? Yes
View EUC/IC Information
To view EUC documents, click the link above.
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
Site Narrative:
The Union Pacific Osawatomie site is a former locomotive refueling facility. The site is now owned by Thomas & Betts, however, the facility is now inactive. Investigations conducted by UPRR indicated petroleum product contamination in soil and ground water on the property. Groundwater at the site is of limited quantity and seems to occur only in a shallow zone of fill material.  
 
Voluntary Cleanup Investigation (VCI) activities have included several phases of soil and groundwater sampling. A storm sewer system is located onsite with several manholes and pits. Because sediment samples from inside the sewer indicated elevated contaminant concentrations and the system itself appears to be a conduit for contamination to potentially leave the site, the storm sewer system was jetted and decommissioned. Manhole covers were welded closed and dropboxes and pits were cemented.  
 
Groundwater at the site appears limited to the fill areas; however, yield tests conducted at two monitoring wells met the threshold for a potable aquifer. In addition, a "boggy" area was noted in one phase of investigation, which indicated a potential exposure risk. Surface water sampling of the creek running through the property was conducted. Contaminants were detected; however, given the proximity of a road, additional sampling may be necessary to determine if the impacts are the result of road run-off or the site discharge.  
 
The VCI Phase III report and post phase III surface water sampling reports were approved in 2013. KDHE requested a VC Proposal to address site contamination. A VC Proposal was submitted in September 2015. KDHE did not approve the VC Proposal as the only media addressed was soil. The Volntary Party provided a work plan (approved by KDHE) to monitor groundwater at the site on a quarterly schedule to evaluate trends at the site for one year. Following the quarterly monitoring for one year, the VC Proposal will be re-evaluated.  
 
2016 Annual GWMR approved. Focused soil investigation WP underway. VC Proposal to follow.  
 
GWM continued through 2017 and 2018. Monitoring wells MW-4 and MW-18 plugged (improperly screened during previous investigations) and replaced with MW-4R and MW-18R. An Environmental Use Control has been placed on the site and a VC Proposal was submitted in March 2019 and is currently under review.

Legal Description:
 Township
 Range
 Section
 Parcel  Description
 18
 22E
 11
   SW

Actions Completed:
 Activity Type  Activity
 Start
Completed
 PRP IDENTIFICATION/NEGOTIATION  Voluntary Agreement    07/26/1999
 INVESTIGATION  VCI - Phased  02/13/2000  10/12/2004
 INVESTIGATION  VCI - Phased  08/22/2005  11/21/2006
 INVESTIGATION  VCI - Phased  11/21/2006  02/26/2007
 INVESTIGATION  VCI - Phased  11/17/2011  07/03/2012
 INVESTIGATION  Voluntary Cleanup Investigation (VCI)  02/13/2000  02/25/2019
 INVESTIGATION  VCI - Phased  02/26/2007  02/25/2019
 EVALUATION OF REMEDIAL ALTERNATIVES  Voluntary Cleanup Proposal  09/15/2015  06/26/2019

Actions Underway:
 Activity Type  Activity
 Start
Completed
 REMEDIAL DESIGN  Voluntary Cleanup Plan    

Actions Proposed:
 Activity Type  Activity
 Start
Completed
       




Map of Identified Site
(One-mile radius circle around selected site)

Click here for interactive map.